The veteran workers in mines and construction sites all have a common concern: large excavators either force themselves to "bear heavy loads" under pressure, resulting in a sharp increase in failure rates, and a single machine having to wait for the entire team to assemble before it can resume work; or they deliberately "slow down" to maintain stability, prolonging the construction period and reducing profits. What's more challenging is that some equipment is out of sync with Concrete Machinery and Truck Mounted Cranes, leaving gaps in the process of loading, transportation, and excavation. This is no small problem - the loss of a day's work, the expenses for frequent repairs, and the penalty for delayed construction deadlines all weigh heavily on the construction companies, making them struggle to breathe. To address this issue, Xuzhou Xuqi Heavy Machinery Co., Ltd. (XQHM) has precisely launched the XCMG XE3870CA tracked excavator, as the flagship model of the XCMG XE series 1.5-70 ton tracked excavators. It breaks the vicious circle of "heavy loads causing damage and high efficiency consuming a lot of fuel", making heavy-load operations both stable and fast, and enabling seamless connection with other equipment.
The actual performance turned out to be much better than what the construction teams had expected: During heavy mining operations in the mine, its power output was uniform and not overly aggressive. It continued to operate without any malfunctions for a week. When used in conjunction with Truck Mounted Cranes for transportation and Concrete Machinery for pouring, the movements were precisely coordinated, and the idle time was reduced by 40%. For the customers, the core effect is clear: The failure rate was reduced by over 60%, eliminating the need to keep spare machines on standby; the operation efficiency was increased by 35%, and the project could be completed in 8 days instead of the original 10 days; the fuel consumption was 25% lower than that of equipment in the same category, and in the long run, it was a considerable saving. More importantly, its value goes beyond "digging"; it can also serve as a "core connection point" at the construction site, driving the efficiency upgrade of the entire equipment system. This is also the core principle of XQHM - "centered on customer needs". Besides this excavator, XQHM also supplies a full range of equipment such as Used Truck Cranes and Scissor Lifts, helping customers solve the pain points of engineering equipment in one go.
This excavator is suitable for heavy-load scenarios such as mine stripping, large-scale factory infrastructure construction, and road widening. Whether it is for hard-rock excavation or continuous loading, it can handle the tasks with ease. Compared to ordinary equipment, it better understands the actual needs of engineers: there is no need to choose between "stability" and "speed", nor is there a need to allocate additional manpower for equipment coordination. It truly achieves "one piece of equipment driving the efficiency of the entire team".
Core Product Features
1.Overloading is not "fragile": As the flagship model of the XCMG XE series 1.5-70 ton tracked excavator, the core components have undergone rigorous testing, ensuring that it can operate continuously under heavy loads without malfunctions.
2. Collaboration without "disconnection": Precisely match the operation rhythms of Concrete Machinery and Truck Mounted Crane, reducing the idle periods between equipment connections;
3. High efficiency without "fuel waste": Intelligent control of power output results in lower fuel consumption compared to similar equipment by 25% even under heavy loads, achieving a balance between efficiency and cost.
Practical Homework Tips
1.Before performing the first load operation, it is recommended to conduct a 30-minute unloaded warm-up period to allow the equipment components to fully "warm up" and extend their service life.
2. When working in conjunction with Truck Mounted Cranes and Concrete Machinery, the operation routes can be pre-set in advance. The precise control of the equipment can reduce the adjustment time.
3. Daily maintenance should be carried out in accordance with the exclusive plan provided by XQHM. The focus should be on checking the tension of the tracks and the hydraulic system to prevent small issues from escalating into major failures.
Nowadays, many construction companies that have been engaged in heavy-load projects have become repeat customers of XQHM after using the XCMG XE3870CA. They have reported that the most remarkable feature of this excavator is that it "understands engineering and understands costs", eliminating the need for the construction companies to compromise at various points. XQHM has always adhered to the principles of "quality first, customer-oriented, and integrity-based", and in addition to this flagship excavator, it can also provide customers with solutions for all types of engineering equipment. In the context of economic globalization, XQHM also warmly welcomes global enterprises to join hands and cooperate to achieve mutual benefit and win-win results.